Porters getting assigned their loads at the starting point of the Lemosho trail up the Kilimanjaro.
Porters getting assigned their loads at the starting point of the Lemosho trail up the Kilimanjaro. Maximum load is 20 kg per porter.
Day 1. Start of the Lemosho route at the Londorossi gate (2360m).